Recertification & material change · cadence & triggers
Prove it's still true, on a cadence
Approval is a snapshot; systems drift. Recertification is the scheduled re-check that a use is still what its record says — and material change is the event that forces the check early, before the next cadence date.
Cadence by posture
LightOn change, or annual.
StandardAnnual.
FullEvery 6–12 months (campus-set).
Owner attestation: purpose, uses, class, controls still true; for Full, efficacy still acceptable. Fail → revise, narrow scope, or retire.
Material change includes
Tap any trigger for detail. Gateway: full registry workflow → campusairegistry.com.
What a recertification checks
Is the purpose still the same?
The use hasn’t quietly expanded beyond what was approved.
Is the data class still right?
Inputs and outputs haven’t crept to a higher class than the record allows.
Are the controls still in place?
Enforcement gates, scopes, and vendor settings still hold and still work.
Is the owner still there?
A named, current owner and backup — not someone who left last term.
Any material change since last time?
New model, modality, integration, audience, or decision authority.
For Full: is it still effective?
Accuracy, drift, and harm are within acceptable bounds for consequential use.
Can people still do it without the AI?
The fallback plan has been tested, and staff can still catch and override wrong output.
Is the footprint still proportionate?
A smaller model or non-AI approach wouldn’t do the job, and public benefit still justifies the cost.
Human capability and fallback plan
What must people still be able to do well, even when the AI can do the task? A plan names what stays human-led, which unaided skills must be kept up, and how that gets tested.
▹What must stay human-led, whatever the system can do?
▹Can staff recognize wrong output, and do they have the authority to override it?
▹Do people keep enough expertise to supervise and challenge the system?
▹Can the work continue during an outage? Has the manual path been tested?
▹Where learning is the point, can students show it without the assistance?
▹Are new staff still getting the experiences that build expertise?
When it is required, and how it is tested
Required: Full posture, and any use in teaching, learning, or assessment.
Recommended: Standard systems that staff rely on daily.
Tested at recert: a manual-fallback drill, or a sample of cases reviewed without the AI and compared with its output.
Fail: if nobody can run the work or catch errors unaided, treat it as a finding. Add training, restore a manual path, or narrow the system's authority.
Footprint
Ask about the environment and public benefit in proportion to scale. Every recert asks a light question: would a smaller model or a non-AI approach do the job? High-compute or large-scale uses get a deeper look: energy and footprint data requested from the vendor at procurement and renewal (when footprint numbers are missing or uncertain, record that rather than guessing), and public benefit weighed alongside institutional savings. Attach it to the existing value and procurement reviews; don't build a separate process.
How a cycle runs
1System flags due from the record’s next-review date, or a material change triggers it early.
2Owner reviews the record against reality and answers the check questions.
3Owner signs an attestation; for Full, attaches an efficacy/quality note.
4Governance spot-checks a sample; gaps become actions with dates.
5Record’s last-review and next-due dates are updated, closing the loop.
Four outcomes of a recert
Recertified
Everything still true — update the dates and continue.
Revised
Small fixes — refresh controls, owner, or vendor settings, then attest.
Scope narrowed
Pull back audience, data class, or authority to bring it back inside policy.
Retired
Can’t be made true or is no longer needed — take it through retirement.
Done-when
Every Standard and Full system has a recert date that is not in the past, a signed owner attestation on the record, and any failed check has already turned into a revision, a scope change, or a retirement.